Uploaded image for project: 'Pentaho Data Integration - Kettle'
  1. Pentaho Data Integration - Kettle
  2. PDI-12552

"Start or Restart Job From Selected Job Entry Copy" button disabled in 5.1.0

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed
    • Severity: High
    • Resolution: Fixed
    • Affects Version/s: 5.1.0 GA
    • Fix Version/s: 5.2.0 GA
    • Component/s: Job, Spoon / User Interface
    • Environment:
    • Notice:
      When an issue is open, the "Fix Version/s" field conveys a target, not necessarily a commitment. When an issue is closed, the "Fix Version/s" field conveys the version that the issue was fixed in.

      Description

      After testing the checkpoints and restart ability in PDI, I noticed that the "start or restart job from the selected job entry" is always disabled.

      Screencast to show this in action:
      https://pentaho.viewscreencasts.com/embed/313ba0b4544a4e8cab24804c5ee98454

      Steps to recreate:
      1) Download attached zip file
      2) Setup checkpoint log table, configure you job do to job logging, and set checkpoints in your job (http://wiki.pentaho.com/display/EAI/Job+checkpoints+and+restartability)
      3) Run job and then attempt to use the "rerun" button from the main spoon perspective

      Restarting at the failed job is working just fine and in the execution window you can also select which job you'd like to start the execution at as shown in the screencast, but the button to do so in the main spoon perspective is disabled.

        Attachments

          Activity

            People

            Assignee:
            tatsiana_kasiankova Tatsiana Kasiankova (Inactive)
            Reporter:
            mmrstik Michael Mrstik (Inactive)
            Votes:
            1 Vote for this issue
            Watchers:
            5 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: